Rayzon Green Certifications

Solar Energy Subsidy Programs in India: A Complete Guide for Businesses and Homeowners

Solar energy subsidy programs in India for homeowners and commercial businesses
06 Aug, 2026

(Note: Solar subsidy programs are subject to revisions by government authorities. Please refer to the latest official guidelines to confirm current eligibility, benefits, and application requirements.)

India’s solar support system is often described simply as a “solar subsidy,” but the rules are different for homeowners and businesses. For homeowners facing rising electricity tariffs and business decision-makers aiming to control operating expenses, turning unused roof space into an on-site solar power plant is one of the most effective long-term investments available today.

To make solar energy affordable and accessible across urban and rural regions, the Government of India—through the Ministry of New and Renewable Energy (MNRE), state distribution utilities (DISCOMs), and public financial institutions—has established financial incentives and subsidy structures.

Navigating these incentives requires a clear understanding of eligibility rules, technical standards, and application procedures. Direct capital grants apply primarily to residential households, while commercial and industrial (C&I) enterprises reduce installation costs through tax benefits, net metering frameworks, and low-interest green loans.

As a leading Solar EPC company in India, Rayzon Green has developed this guide to help homeowners and industrial leaders navigate government solar subsidy schemes, confirm eligibility criteria, and optimize long-term returns on solar investments.

Quick Answer: What solar subsidies are available in India in 2026?

India offers direct capital grants of up to ₹78,000 for residential homes under the central PM Surya Ghar: Muft Bijli Yojana. Commercial and industrial enterprises do not receive direct cash grants but benefit from 40% Accelerated Depreciation tax offsets, concessional SIDBI green loans, GST benefits, and Net Metering savings.

Understanding India's Solar Subsidy Framework

A government solar subsidy is a financial incentive designed to lower the upfront capital cost of installing rooftop solar systems. Offered as direct capital grants, state top-ups, or tax write-offs, these incentives shorten payback periods and improve project return on investment (ROI).

In the residential sector, renewable energy incentives take the form of direct capital grants-known as Central Financial Assistance (CFA)-transferred directly to the consumer's verified bank account via Direct Benefit Transfer (DBT). Conversely, commercial solar installation projects and heavy industrial units do not receive direct grant subsidies from central funds. Instead, the government supports commercial and industrial solar adoption through tax equity incentives-such as Accelerated Depreciation under Section 32 of the Income Tax Act-concessional debt financing through public sector financial institutions, GST rationalization, and favourable net metering policies.

Parameter

Residential Solar Sector

Commercial & Industrial (C&I) Sector

Primary Incentive Type

Direct Capital Grant (CFA) via Direct Benefit Transfer (DBT)

Tax Offsets, Accelerated Depreciation & Concessional Debt

Central Scheme Name

PM Surya Ghar: Muft Bijli Yojana

SIDBI Green Finance, Accelerated Depreciation (Section 32)

Maximum Central Subsidy Cap

₹78,000 per individual household (capped at 3 kW)

No capital grant cap; 40% Accelerated Depreciation tax benefit

Key Technical Mandate

Mandatory ALMM-listed modules & empanelled EPC installation

ALMM compliance, duty rationalization & open-access rules

Primary Financial Objective

Slash household utility bills & deliver free electricity

Lower operational cost per unit & meet corporate ESG/Net-Zero goals

Understanding this structural separation helps property owners and industrial decision-makers choose the right strategy. While homeowners focus on capacity caps and central portal registration, commercial enterprises evaluate energy yield performance, balance-of-system (BOS) quality, and capital structure optimization under CAPEX or OPEX deployment models.

PM Surya Ghar Muft Bijli Yojana: Complete Residential Solar Subsidy Guide

Launched with a total budget allocation of ₹75,021 crore, the PM Surya Ghar: Muft Bijli Yojana represents the cornerstone of India’s residential rooftop solar subsidy drive. Designed to solarize 1 crore households across the country, the program provides central financial grants while offering qualifying residential consumers up to 300 units of free solar-generated electricity per month.

Central Financial Assistance Slabs and Structure

Under the PM Surya Ghar Yojana, the central government provides a fixed capital solar installation subsidy based on the total installed system capacity. The subsidy is structured to offer maximum support for smaller residential systems, where the upfront capital cost is higher relative to overall household power consumption.

Installed System Capacity (kW)

Central Financial Assistance (CFA) Rate

Maximum Central Subsidy Amount

Estimated Free Generation / Month

1 kW System

₹30,000 per kW

₹30,000

~100 – 150 Units

2 kW System

₹30,000 per kW

₹60,000

~150 – 200 Units

3 kW System

₹30,000/kW for first 2 kW + ₹18,000 for 3rd kW

₹78,000

~200 – 300 Units

Above 3 kW (Up to 10 kW)

Fixed Cap (No additional CFA beyond 3 kW)

Capped at ₹78,000

Exceeds 300 Units

For a standard 3 kW residential solar rooftop installation-the most frequently chosen capacity for urban Indian households-the cumulative central subsidy amounts to ₹78,000. Given an average benchmark installation cost ranging between ₹1.5 lakh and ₹1.8 lakh, the central government subsidy covers roughly 43% to 52% of the initial capital cost, significantly lowering the barrier to clean energy adoption.

Incentives for Group Housing Societies and Resident Welfare Associations

The PM Surya Ghar initiative extends financial support to multi-story apartment complexes, Group Housing Societies (GHS), and Resident Welfare Associations (RWAs). Common residential utilities-such as water pumps, elevators, perimeter lighting, and electric vehicle (EV) charging stations-represent a major recurring operational cost for housing societies.

  • Subsidy Allocation Rate: ₹18,000 per kW for common facility rooftop solar power systems.
  • System Capacity Ceiling: Applicable up to a maximum total system capacity of 500 kW per housing society.
  • Per-Apartment Limit: The eligible capacity is calculated at an upper ceiling of 3 kW per individual residential flat, inclusive of any individual solar rooftop setups already installed by residents within the complex.

Additional Benefits for Special Category States

Recognizing the higher transport, installation, and civil construction expenses in geographically challenging regions, the MNRE provides an additional 10% financial grant per kW for special category states and union territories. Regions qualifying for this enhanced residential solar subsidy include the North-Eastern States, Sikkim, Uttarakhand, Himachal Pradesh, Jammu & Kashmir, Ladakh, Lakshadweep, and the Andaman & Nicobar Islands.

Detailed Focus: Eligibility Criteria for Solar Rooftop Subsidy

Securing financial assistance under government solar subsidy programs requires full compliance with applicant qualifications, technical component standards, and installation procedures. DISCOMs and central portal administrators apply these criteria strictly during technical feasibility reviews and post-commissioning site audits.

Applicant and Property Eligibility Requirements

To qualify for direct capital financial assistance under current MNRE solar schemes, an applicant must satisfy the following core requirements:

  1. Citizenship and Identity: The applicant must be an Indian citizen possessing valid government identification documents, primarily an Aadhaar card linked to an active mobile number.
  2. Property Ownership: The applicant must hold legal ownership of the residential property or plot where the rooftop solar installation is planned1. For ancestral or joint family properties, an official No Objection Certificate (NOC) or property ownership clearance document must be provided.
  3. Valid Electricity Connection: The premises must have an active domestic electricity connection registered under the local DISCOM, with a history of regular utility bill payments and no outstanding defaults.
  4. Single-Subsidy Constraint: The specific property and utility meter account must not have previously received any central or state government subsidy for a rooftop solar setup. Subsidies are granted on a one-time basis per registered residential consumer connection.
  5. Group Housing Qualifications: Housing societies, RWAs, and Apartment Owners Associations (AOAs) must be officially registered legal entities holding a shared common-area electricity connection under a commercial or residential society tariff slab.

Technical, Equipment, and Quality Compliance Standards

Subsidy disbursements are strictly tied to technical quality criteria to ensure that public funds support long-lasting solar infrastructure:

  • Mandatory ALMM Listing: Solar PV modules used in subsidized installations must be selected from the MNRE-issued Approved List of Models and Manufacturers (ALMM). Modules sourced from unapproved or non-ALMM manufacturers automatically disqualify the project from receiving central subsidies.
  • BIS and IEC Certifications: All balance-of-system components—including grid-tied string inverters, array junction boxes, distribution boards, DC/AC cables, and earthing equipment—must carry Bureau of Indian Standards (BIS) certification and comply with international testing standards, such as IEC 61215 and IEC 61730.
  • Empanelled Vendor Execution: The solar system must be supplied, constructed, and commissioned by an empanelled Solar EPC vendor officially registered on the National Rooftop Solar Portal. Self-installed systems or projects executed by non-registered contractors are ineligible for subsidy claims.
  • Sanctioned Load Alignment: The installed solar rooftop capacity should generally align with the household's sanctioned electricity load connection. While consumers can request an upgrade to their sanctioned load through their DISCOM, installing a solar array significantly higher than the approved grid load without prior DISCOM authorization can lead to technical rejection during feasibility checks.

Regulations for System Enhancements and Expansion

For households that already have a grid-connected solar installation and wish to expand their capacity, MNRE guidelines set clear conditions for incremental subsidy claims:

  • Incremental Capacity Subsidy: If a homeowner previously installed a 1 kW rooftop solar system under an earlier scheme and claimed a ₹30,000 subsidy and later expands the total system capacity to 4 kW, the consumer can claim an additional subsidy for the newly added capacity.
  • Subsidy Cap Calculation: The additional subsidy applies to the incremental capacity up to the national ceiling of 3 kW. In this scenario, the homeowner receives an additional ₹48,000 (covering the second and third kW), bringing the total combined subsidy claimed to the national maximum of ₹78,000.
  • Prohibition of Second-Hand Equipment: Shifting, relocating, or installing second-hand rooftop solar panels from another site strictly invalidates subsidy eligibility. The portal tracks module serial numbers against manufacturing records to verify authenticity.

Step-by-Step Guide: How to Apply and Claim Your Solar Subsidy

The application, approval, and disbursement workflow for residential rooftop solar subsidies is fully digitized through the official National Rooftop Solar Portal (pmsuryaghar.gov.in). This streamlined portal ensures transparency, reduces processing times, and tracks direct benefit transfers.

Phase 1: Registration and Technical Feasibility Approval

First, access the National Rooftop Solar Portal and click on the registration section. Select your state, select your local electricity distribution company (DISCOM), and enter your active electricity consumer account number from your monthly bill. Verify your identity by entering your mobile number, authenticating with the OTP sent to your registered device, and completing your user profile setup.

Once registered, log in to the consumer portal, select your desired rooftop solar plant capacity, and upload a copy of your recent electricity bill alongside property ownership proof. The portal automatically routes your application to your local DISCOM for technical feasibility assessment. DISCOM engineers evaluate transformer capacity and distribution line safety before issuing technical feasibility approval directly on the portal within 15 to 30 working days.

Phase 2: EPC Selection and System Installation

After receiving technical feasibility approval from your DISCOM, select a registered, empanelled Solar EPC company in India from the district-wise directory on the portal. Selecting an experienced EPC partner ensures high-quality engineering, procurement of genuine ALMM-listed solar panels, and safe electrical installation.

Work with your chosen EPC partner to finalize system design, execute the commercial agreement, and begin installation. The EPC provider installs high-efficiency PV panels, mounts corrosion-resistant support structures, connects grid-interactive inverters, and sets up safety earthing and lightning protection.

Phase 3: Inspection, Net Metering, and Commissioning

Upon completing mechanical and electrical installation, your EPC vendor uploads the plant execution details, component serial numbers, and site photographs onto the National Portal. This action submits a formal request to the DISCOM for net meter installation and final system inspection.

A DISCOM field engineer visits the property to inspect the installation, confirm that the solar modules match ALMM records, and perform safety checks. Following a successful inspection, the DISCOM installs a bi-directional net meter, integrates the system with the local distribution grid, and issues an official Commissioning Certificate through the portal.

Phase 4: Direct Benefit Transfer (DBT) Disbursement

After the commissioning certificate is generated, log in to your account on the National Rooftop Solar Portal and navigate to the bank details submission page. Enter your bank account number, IFSC code, and upload a scanned copy of a cancelled cheque or bank passbook.

The central finance division verifies the uploaded financial records against the applicant's name and processes the payment. The approved Central Financial Assistance (CFA) subsidy is credited directly to your bank account via Direct Benefit Transfer (DBT) within 30 working days.

To ease the initial investment for homeowners, public sector banks offer collateral-free solar loans for systems up to 3 kW. Available through the central JanSamarth portal, these loans carry concessional interest rates (~7% per annum, linked to the RBI Repo Rate) and flexible repayment terms, allowing families to install solar systems with minimal upfront cash outlays.

Common Mistakes to Avoid

  • Selecting Non-Empanelled Installers: Subsidies are disbursed only for systems installed by empanelled EPC vendors registered on the official National Portal. Self-installed setups or unverified contractors are ineligible for subsidy claims.
  • Buying Non-ALMM Solar Panels: Installing modules not listed on the MNRE Approved List of Models and Manufacturers (ALMM) leads to rejection during DISCOM inspections.
  • Incorrect Portal Documentation: Mismatches between the applicant's name on the electricity bill, Aadhaar card, and bank account can delay Direct Benefit Transfer credits.
  • Delaying Net Metering Filings: Completing physical installation without filing timely DISCOM applications delays grid connection and commissioning certificates.
  • Selecting Systems Without Proper Engineering: Installing panels without structural load checks or shading analysis reduces energy generation by 10% to 20% over the plant's lifespan.

State-Wise Solar Subsidies and Regional Top-Up Incentives

While Central Financial Assistance remains uniform across India, several state governments offer additional state-level top-up subsidies to further lower initial capital costs for homeowners. Combining state top-ups with central subsidies significantly shortens the overall investment payback period.

  • Gujarat: Leads national residential solar adoption with over 5.15 lakh installed systems. The state's digital processing across regional DISCOMs (DGVCL, MGVCL, PGVCL, UGVCL) ensures quick technical feasibility checks and fast net metering integration.
  • Maharashtra: Provides state top-up subsidies ranging from ₹25,000 to ₹60,000 for residential systems up to 3 kW via the MSEDCL i-SMART portal. Combined with central grants, total subsidy support can reach up to ₹1,38,000 for a 3 kW system.
  • Delhi: Under the Delhi Solar Policy, residential consumers can receive a state top-up of ₹10,000 per kW (capped at ₹30,000) alongside Generation-Based Incentives (GBI) of ₹1.00 to ₹3.00 per unit generated.
  • Karnataka: Offers a state top-up subsidy of ₹10,000 per kW (up to 3 kW) in addition to central grants, alongside favorable net metering rules for residential consumers.
  • Tamil Nadu, Rajasthan, Uttar Pradesh & Madhya Pradesh: These states offer active DISCOM support frameworks, streamlined net metering procedures, and open-access policies for industrial energy buyers.

Note: State-level subsidy allocations and regulatory policies update regularly. Consumers and business owners should verify current guidelines with their local DISCOM or Solar EPC partner before starting a project.

State Name

Central Subsidy (3 kW System)

State Top-Up Subsidy Structure

Maximum Combined Subsidy Benefit

Key Regional Advantage

Maharashtra

₹78,000

₹25,000 to ₹60,000 state top-up

Up to ₹1,38,000

Fast-track processing via MSEDCL i-SMART portal

Delhi

₹78,000

₹10,000/kW capital grant (Max ₹30,000)

Up to ₹1,08,000 + Ongoing GBI

Monthly Generation-Based Incentive credits on bills

Karnataka

₹78,000

₹10,000/kW state top-up (Up to 3 kW)

Up to ₹1,08,000

Favorable net metering grid settlement rules

Gujarat

₹78,000

Streamlined administrative support

₹78,000 + Faster Turnaround

Fastest net meter installation & commissioning times

Tamil Nadu

₹78,000

Regional DISCOM promotional support

₹78,000 + Standard Grid Benefits

Priority grid connection for urban housing clusters

Commercial and Industrial (C&I) Solar Incentives and Financial Models

Commercial enterprises, industrial manufacturing facilities, textile mills, pharmaceutical plants, and chemical units consume over half of India’s grid electricity. Although commercial solar installation projects do not receive direct grant subsidies from central funds, the government provides significant tax offsets, rapid asset write-off mechanisms, and green financing frameworks to support industrial solar adoption.

Quick Answer: Can commercial businesses get solar subsidies in India?

Commercial and industrial enterprises do not receive direct cash grants or capital subsidies from central schemes. However, businesses reduce solar installation costs through 40% Accelerated Depreciation, concessional SIDBI green loans, Open Access mechanisms, and Net Metering bill offsets.

Tax Benefits: Accelerated Depreciation (AD) and Income Tax Savings

For commercial enterprises investing in solar power under the CAPEX (Capital Expenditure) model, solar systems act as an effective tax planning asset:

  • Accelerated Depreciation (AD): Under Section 32 of the Income Tax Act, commercial and industrial businesses can claim up to 40% Accelerated Depreciation in the first operational year of a solar plant2.
  • Taxable Income Offsets: By accelerating asset depreciation schedules, profit-making enterprises can write off a significant portion of solar equipment costs against taxable income, lowering corporate tax liabilities and improving early project cash flow.
  • GST Rationalization: Solar PV panels and balance-of-system equipment benefit from concessional Goods and Services Tax (GST) slab classifications, helping lower total project capital expenditure.

Strategic Capital Deployment Models for C&I Solar

Industrial decision-makers can structure solar investments through three primary commercial execution models depending on balance sheet priorities and capital availability:

Execution Model

Initial Capital Requirement

System Asset Ownership

Tax & Depreciation Benefits

Maintenance Responsibility

Typical Payback Period

CAPEX Model

100% Upfront (Self-Funded or Debt)

Retained by Enterprise

Fully Claimed by Enterprise (40% AD)

Enterprise / Solar EPC Partner

3.0 – 4.0 Years

OPEX / PPA Model

Zero Upfront Capital (0%)

Retained by RESCO Developer

Retained by RESCO Developer

RESCO Developer (Full Term)

Immediate Savings from Day 1

Group Captive

26% Equity in Off-Site SPV

Shared Pro-Rata Equity

Pro-Rata SPV Claim

Off-Site Developer / O&M Partner

3.5 – 4.5 Years

Solar Financing India: Concessional Debt and SIDBI Loan Schemes for MSMEs

To help Micro, Small, and Medium Enterprises (MSMEs) transition to solar energy without straining operational cash flow, the Small Industries Development Bank of India (SIDBI) offers concessional green debt frameworks. These financial products eliminate traditional collateral constraints and feature competitive, MCLR-linked interest rates.

SIDBI Loan Scheme

Eligible Target Segment

Loan Quantum Limits

Repayment Tenure & Moratorium

Key Eligibility Criteria

SIDBI STAR

MSMEs installing rooftop solar installations

₹10 Lakh to ₹3.5 Crore

Up to 5 Years (6 to 12 months moratorium)

3+ years operational history; 2 years cash profits

SIDBI 4E / Green Finance

Enterprises adopting green energy technology

Up to ₹50 Crore (Max 80% project cost)

Up to 7 Years (Up to 2 years moratorium)

2+ years audited operations; strong credit rating

SIDBI ARISE

MSMEs expanding clean energy capacity

Up to ₹7 Crore (Max 80% project cost)

Up to 7 Years (Up to 2 years moratorium)

2–3 years business vintage; profitable track record

Regulatory Frameworks: Net Metering, ALMM Compliance, and Grid Rules

The long-term financial performance of a rooftop solar investment depends heavily on compliance with national quality standards and state utility grid regulations.

Net Metering Operations and Billing Settlement

Net metering provides the regulatory foundation for grid-connected rooftop solar installations. A bi-directional net meter tracks energy flow in two directions: power drawn from the utility grid during non-solar hours and excess solar electricity exported to the grid during daytime generation peaks.

At the end of each monthly billing cycle, the local DISCOM deducts exported solar units from consumed grid units. If solar generation exceeds total consumption, the excess net energy credits roll over to the next billing month, reducing future utility bills. Correct system sizing-matching daytime generation with peak facility loads-ensures maximum financial benefit under local DISCOM net metering rules.

Mandatory ALMM Quality Standards

To protect consumers and support domestic solar manufacturing, the MNRE enforces strict compliance with the Approved List of Models and Manufacturers (ALMM). Solar panels installed under subsidized government schemes must be sourced from ALMM-certified production facilities.

ALMM certification ensures that solar modules undergo extensive testing—including Kiwa PVEL evaluation, thermal cycling, damp heat exposure, and potential-induced degradation (PID) resistance—guaranteeing consistent power generation over a 25-year operational life. Using non-ALMM panels in subsidized projects results in automatic rejection during DISCOM site inspections.

Managing Cross-Subsidy Surcharges (CSS) for Industrial Solar

Commercial and industrial power tariffs in India are higher than residential rates because utilities use C&I revenue to cross-subsidize low-income and agricultural power consumers. While shifting to on-site rooftop solar allows businesses to reduce exposure to grid tariffs, state DISCOMs periodically adjust Cross-Subsidy Surcharges (CSS) and Additional Surcharges on open-access solar power. Installing on-site rooftop solar systems or structured Group Captive off-site plants provides a reliable hedge against rising grid surcharges, delivering predictable long-term energy costs for industrial facilities.

Strategic EPC Execution: The Rayzon Green Advantage

Navigating solar energy subsidy programs in India, completing net metering approvals, and ensuring long-term system performance requires an experienced execution partner. The quality of initial engineering, component selection, and construction directly impacts energy yields.

Integrated Supply Chain Security

Unlike independent contractors who purchase components through third-party distributors, Rayzon Green leverages direct supply integration with its parent manufacturing infrastructure. This vertical integration delivers major operational benefits:

  • Tier-1 Quality Assurance: Direct access to high-efficiency, ALMM-listed bifacial TOPCon modules guarantees exceptional generation performance and heat tolerance, ensuring maximum power output over a 25-year lifespan.
  • Cost Efficiency: Eliminating supply chain intermediaries allows Rayzon Green to offer competitive turnkey pricing for residential systems and large industrial solar projects.
  • Reliable Project Timelines: Direct factory supply prevents equipment delays, ensuring on-time project completion, swift DISCOM inspections, and prompt subsidy claim filings.

End-to-End Administrative and Lifecycle Management

Rayzon Green manages the entire regulatory process—from initial load feasibility applications and DISCOM documentation to net meter installation and subsidy tracking on the National Portal1. Following system commissioning, Rayzon Green’s dedicated Operations and Maintenance (O&M) teams use real-time IoT monitoring to track generation performance ratios, perform preventive maintenance, and ensure continuous maximum energy yield throughout the system’s operational lifespan.

Strategic Investment Roadmap for 2026

The combination of central grants under the PM Surya Ghar scheme, state top-up subsidies, 40% Accelerated Depreciation tax benefits, and concessional SIDBI green loans makes 2026 an ideal time to invest in solar energy in India.

Conclusion

>Government solar energy subsidy programs—led by the PM Surya Ghar: Muft Bijli Yojana for residential homes, alongside tax offsets and green financing for commercial enterprises—have made solar power adoption in India highly accessible and financially rewarding.

>Whether you want to reduce household utility expenses or lower operational energy costs for a manufacturing plant, evaluating central and state incentives is the first step toward clean energy independence.

>Partnering with an experienced, vertically integrated Solar EPC company like Rayzon Green ensures high-quality engineering, compliant component sourcing, smooth DISCOM approvals, and long-term system performance.

Frequently Asked Questions (FAQs)

1. Who is eligible for solar subsidies in India?

Indian citizens who own a residential property with an active domestic DISCOM electricity connection and suitable rooftop space qualify for direct capital subsidies under the PM Surya Ghar Yojana, provided they have not claimed a rooftop solar subsidy previously.

2. Can industrial and commercial enterprises receive direct government solar subsidies?

Commercial and industrial (C&I) projects do not receive direct cash subsidies from central schemes. However, businesses save significantly through 40% Accelerated Depreciation tax write-offs, net metering bill offsets, concessional SIDBI green loans, and Open Access provisions.

3. Is the PM Surya Ghar Yojana available for commercial businesses?

No, the PM Surya Ghar Yojana is exclusively designed for residential households, Group Housing Societies (GHS), and Resident Welfare Associations (RWAs). Commercial entities utilize tax offsets and concessional financing frameworks instead.

4. Are solar subsidies available in every state across India?

Yes, Central Financial Assistance (CFA) under the PM Surya Ghar scheme is uniform across all states and union territories. Additionally, several state governments offer regional top-up subsidies or Generation-Based Incentives through local DISCOM portals.

5. What is Net Metering, and how does it reduce monthly electricity costs?

Net metering uses a bi-directional meter to track electricity drawn from the grid and excess solar power exported to the grid. At the end of the billing cycle, the utility deducts exported solar units from consumed grid units, lowering monthly electricity expenses.

6. How long does it take to receive the solar subsidy disbursement?

Once the system is installed, inspected, and commissioned with a net meter, the approved Central Financial Assistance (CFA) is transferred directly to the applicant's bank account via Direct Benefit Transfer (DBT) within 30 working days.

7. Can I install a rooftop solar system without claiming a subsidy?

Yes, homeowners and businesses can install grid-tied or off-grid solar systems without government subsidies. While non-subsidized systems do not require empanelled vendor restrictions or ALMM module constraints for self-consumption, grid-tied net metering rules still apply.

8. What solar financing options are available for homeowners and MSMEs?

Homeowners can access collateral-free solar loans at competitive interest rates (~7% per annum) through public sector banks on the central JanSamarth portal. MSMEs can apply for low-interest, concessional term loans through SIDBI schemes like STAR, 4E, and ARISE.

9. Does Rayzon Green help with government subsidy applications and DISCOM approvals?

Yes, Rayzon Green provides complete turnkey EPC services—handling roof feasibility assessments, National Portal filings, DISCOM paperwork, net meter coordination, and documentation support to ensure smooth subsidy disbursement.

10. How can business owners calculate potential savings and solar plant ROI?

Solar ROI depends on existing DISCOM electricity tariffs, available unshaded rooftop area, annual energy consumption, and capital structure (CAPEX vs OPEX). By combining 40% Accelerated Depreciation with reduced per-unit generation costs, most C&I solar plants achieve complete financial payback within 3 to 4 years.